Contact:-ajmeralam2000@gmail.com/Cell:-919906103001
Minister for R&B, Mr. G.M.Saroori today ordered suspension of a Junior Engineer, Mr.Sushil Mahajan and attachment of an Assistant Executive Engineer, Mr. Yoginder for using sub standard material in macadamization of roada link in Khour block
The Minister while visiting Khour inspected a link road at Chak Malal and found that the road has not been macadamized as per the set specifications.
The Minister asked the concerned Superintending Engineer(SE) to collect the samples of the material used for the macadamization and get its laboratory analysis and report within three days.
Mr. Saroori also instructed the SE to get the work re-done by the concerned engineer at his own cost. He asked SE to black list the contractor and stop the payment till the contractor completes the assigned work.
The Minister also ordered constitution of a team headed by the SE to check whether the standards have been adopted in macadamization of all the roads in Khour and other blocks of the
No comments:
Post a Comment
Note: only a member of this blog may post a comment.